COMPLETE WASTEWATER

TREATMENT FACILITIES

VILLAGE OF ROXANA, IL

MORE PHOTOS
PROJECT DATA

CLIENT:  Village of Roxana, IL                      CONSTRUCTIONCOST:  $5,929,000 CAPACITY:  0.65 MGD

Construction of this project began in January 2010 and will include construction of an influent pump station and force main, and influent flow meter and meter vault, a cylindrical fine screen unit, two (2) Biolac Wave Oxidation Basins, two (2) circular final clarifiers, one (1) Ultraviolet Disinfection Basin and equipment, an effluent pump station, and effluent flow meter and meter vault, a Return Activate Sludge / Waste Activated Sludge pump station, a waste sludge pump station, a decant / process 
waste pump station, a scum pump station, two (2) aerobic digester basins, sludge drying beds, a sludge storage building and loading facility, and chemical feed equipment for phosphorus removal.   

Construction will also involve blowers including all related equipment and air piping, composite samplers, a garage/shop & building, a laboratory/office building, a process water pumping system, process piping including valves and manholes, site paving and surfacing, electrical equipment and controls, standby generators, collection system modifications, and miscellaneous equipment and structures.

© 2015 Curry & Associates Engineers Inc.  |  Civil & Environmental Engineers  |  Nashville, Illinois  |  618.327.8841